VSTE

ISSN (online): 1805-9112

Open access

Methods of Formulating Business Goals Implemented in ERP Accounting Systems

Abstract

The importance of technological innovations is gaining in intensity with the growth of production, distribution and expansion abroad, together with the development of the potential of knowledge workers. The use of automation in robotic processes is used in business processes, which allows increasing productivity in individual parts of processes. The ERP system can accelerate and support efficiency in the supplier and customer process, e.g. in conjunction with Customer Relationship Management. The aim of the paper was to implement an ERP accounting system for a specific project of a company in an international corporation. The aim of the project was to increase the efficiency of accounting operations, simplify the process of recording invoices in the system, and increase the security of the system so that it meets the requirements of accounting audit and IFRS. The primary method used was the logical framework method, which dealt not only with setting business objectives, but also with project management in general, taking into account project management and measurable project outputs, albeit with low / minimum added value and gross time risk.

Keywords:business goalsmethods SMART &ampCLEARObjective Key ResultsLogical Frame LogframeERP accounting system

References

  1. Akhanova, M. A., et al. (2018). Methodology of estimating IT project efficiency. International Journal of Mechanical Engineering and Technology, 9(13), 803–809.
  2. American University Washington. (2020). What is a Logframe? Retrieved May 15, 2020, from http://programs.online.american.edu
  3. Andreeva, I. Y., et al. (2019). Financial engineering of infrastructure projects: The concessional mechanism. International Journal of Economics and Business Administration, 7, 61–73.
  4. Astanakulov, O. (2019). Real options as a financial instrument to evaluate a project with a high degree of uncertainty: The specifics of application. Economic Annals-XXI, 179, 105–114.
  5. Bershadsky, A., et al. (2019). Integrated approach to the self-adaptive software development based on reflection and observation of the information environment. In Proceedings of the 2019 Actual Problems of Systems and Software Engineering (APSSE 2019) (pp. 89–115).
  6. Bing, C. G., Yang, G., & Kang, J. (2020). System implementation of a processing subcontracting business in SAP ERP non-standard subcontracting scenarios. Lecture Notes in Electrical Engineering, 640, 411–425.
  7. Bočková, K., Gabrhelová, G., & Vaníčková, R. (2017). Risk management in Czech manufacturing company: Case study. International Journal of Applied Business and Economic Research, 15(19), 59–73.
  8. Colapinto, C., Jayaraman, R., & La Torre, D. (2020). Goal programming models for managerial strategic decision making. Studies in Systems, Decision and Control, 177, 487–507.
  9. Erskine, M. A., Khojah, M., & McDaniel, A. E. (2019). Location selection using heat maps: Relative advantage, task-technology fit, and decision-making performance. Computers in Human Behavior, 101, 151–162.
  10. Feng, X., et al. (2020). Mobile targeting in industrial marketing: Connecting with the right businesses. Industrial Marketing Management, 86, 65–76.
  11. Głodziński, E. (2019). Performance measurement of complex project: Framework and means supporting management of project-based organizations. International Journal of Information Systems and Project Management, 7(2), 21–34.
  12. Huikku, J. T., Hyvönen, T., & Järvinen, J. (2017). The role of a predictive analytics project initiator in the integration of financial and operational forecasts. Baltic Journal of Management, 12(4), 427–446.
  13. Izhar, R., et al. (2018). Impact and challenges of requirements management in enterprise resource planning (ERP) via ERP thesaurus. International Journal of Advanced Computer Science and Applications, 9(8), 247–258.
  14. Kitsios, F., et al. (2019). Information systems strategy in SMEs: Critical factors of strategic planning in logistics. Kybernetes, 49(4), 1197–1212.
  15. Martínez-Blanco, J., Forin, S., & Finkbeiner, M. (2020). Challenges of organizational LCA: Lessons learned from road testing the guidance on organizational life cycle assessment. International Journal of Life Cycle Assessment, 25(2), 311–333.
  16. Mousaei, M., & Candomani, T. J. (2018). A new project risk management model based on Scrum framework and Prince2 methodology. International Journal of Advanced Computer Science and Applications, 9(4), 442–449.
  17. My Le, H. T., Hoang Tran, P. T., & Thuy Tran, L. D. (2018). Factors influencing the effectiveness of the accounting information system: A case from Vietnamese firms. Journal for Global Business Advancement, 11(5), 587–609.
  18. Nývlt, V. (2018). Role of BIM process participants within managing knowledge in BIM data model. International Multidisciplinary Scientific GeoConference Surveying Geology and Mining Ecology Management, SGEM, 18(5.3), 711–718.
  19. Pan, G., Teoh, S., & Seow, P. S. (2014). Coordinating the processes of resource enrichment and capability deployment: Lessons from IT implementation at a medium-sized accounting firm. International Journal of Accounting and Information Management, 22(4), 357–374.
  20. Pearson, T. (2019). Goal setting & team management with OKR (Objectives and Key Results): Smart project management skills for effective office leadership, business focus, and growth: How to manage people and employees.
  21. Ploder, C., Dilger, T., & Bernstein, R. (2020). A framework to combine corporate budgeting with agile project management. CEUR Workshop Proceedings, 2581, 19–23.
  22. Reisenwitz, T. H., & Fowler, J. G. (2019). Information sources and the tourism decision-making process: An examination of Generation X and Generation Y consumers. Global Business Review, 20(6), 1372–1392.
  23. Sankaran, B., O'Brien, W. J., & Grau, D. (2018). Impact of CIM technologies and agency policies on performance for highway infrastructure projects. Journal of Construction Engineering and Management, 144(7), Article 04018052.
  24. Wu, P., et al. (2019). Work-in-progress: Joint network and computing resource scheduling for wireless networked control systems. In Proceedings of the Real-Time Systems Symposium (pp. 181–184).
  25. Wei, Q., et al. (2020). Retailer vs. vendor managed inventory with considering stochastic learning effect. Journal of the Operational Research Society, 71(4), 628–646.